Analysis of Diesel Generator Manufacturers Brief Overview of Installation, Use and Commissioning of

Author: Diesel generator set manufacturer Time:2021-12-28

Diesel generator set is a high-speed rotating equipment. Before it is put into operation, it must be installed correctly to ensure the safe, reliable, economical and reasonable normal operation of the unit. Therefore, enough attention should be paid to the installation. This section mainly introduces the installation methods and precautions of diesel generator sets and their auxiliary equipment.
(1) The handling and storage of the unit and other electrical equipment are all packed with boxes. During handling, attention should be paid to tying the lifting steel cable at the appropriate part of the machine and lifting it lightly. When lifting the unit for installation, first connect the protruding lifting points on the underframe, and then check whether it has been firmly hung, whether there are cracks in the welding place and whether the screws are tightened.
(2) unpacking inspection, check whether the box is damaged, and verify the box number and quantity. Remember not to touch the unit when unpacking.
① count all units and accessories according to the unit list and packing list.
② Check whether the main dimensions of the unit and accessories are in accordance with the drawings.
③ Check whether the unit and accessories are damaged or rusted.
④ After unpacking, the unit should be kept in good condition, and the flanges and various interfaces must be sealed and bandaged to prevent rain and sand from invading people. < br/ > if the unit cannot be installed in time after inspection, the finished surface of the disassembled parts should be coated with antirust oil again and kept properly. For the transmission part and sliding part of the unit, do not rotate or slide before the antirust oil is removed. If the antirust oil has been removed due to inspection, it should be reapplied after inspection.
(3) Scribed positioning The vertical and horizontal reference lines of the installation site of the units shall be defined according to the dimensions of the relationship between each unit and the center of the wall or column and between units marked in the plane layout. The allowable deviation between the center of the unit and the wall and column is 20mm, and the allowable deviation between units is 10mm. < br/>(4) Understand the design content, prepare the construction material inspection equipment, understand the design content, understand the construction drawings, and refer to the instruction manual. Prepare materials according to the materials needed in the design drawing, and then deliver the materials to the site according to the sequence of the construction organization plan.
(5) Prepare lifting equipment and installation tools
Jiangsu Kaichen Electrical Engineering Equipment Co.,Ltd. is a professional generator manufacturer, generator manufacturer, diesel generator manufacturer, generator set, silent generator set, mobile generator set, and diesel generator set produced in the same brand and with the same configuration. All brands of diesel generator sets have free national warranty and free on-site installation guidance, so they can enjoy perfect after-sales service. Please invite them all over the country.
Jiangsu Kaichen Electrical Engineering Equipment Co.,Ltd. www.jskcdl.com
Generator manufacturer, generator set manufacturer, diesel generator set manufacturer, generator set.






One-button dialing Contact